Market entry and delivery of industrial projects in Kazakhstan. Construction is contracted with the partner. Housing and premises are arranged in support of the project.

Project diagnostic

from USD 28 000

A written assessment of the legal structure, required permits, grid connection, climatic and seismic conditions, local content and capital risks. The output is a sequence of work and a list of open questions before capital expenditure is committed.

Market-entry retainer

from USD 8 000 / month

Ongoing legal counsel, filings with authorities, localisation decisions, and coordination of the designer and contractor while the investor’s team remains abroad. The retainer covers project management of the sequence, not construction works.

Owner’s representative

from 0.8% of capex

Representation of the investor during construction, installation and commissioning: coordination with the general contractor, acceptance of stages, and reporting to headquarters. The general contract with EPCM Construction is concluded separately.

Independent site audit

from USD 35 000

Review of design documentation and construction works on a site that is not built by our construction partner under this mandate. The deliverable is a report for headquarters. EPCM Construction does not act as general contractor of the same facility.

HQ monitoring platform

from USD 3 200 / month

A visual monitoring system for named headquarters users: regular records of the full facility (360°, ground and air, concealed works, timelapse and path video, object map, access by role). Data is stored locally on the company's servers.

Housing and land

On request

Residence-permit support and housing for employees of the client company; selection of offices, warehouses and plots through specialised partners in the cities where the project operates.

Sequence of work

The path is sequential: legal presence and assessment, then the operating model, then design and expert review, then construction and reporting.

  1. 1. Incorporation

    The investor obtains a legal presence in Kazakhstan so that later contracts, payments and permits are executed in its name. Meetings with the delegation are arranged in Astana or Almaty when required. The operating office of Orken Partners is in Aktobe. Support continues through commissioning of the facility.

    • Legal entity (LLP or another form as agreed), director, bank account, tax and currency registration
    • Residence permits for employees of the client company, including specialists posted to the project
    • Calendar of subsequent filings that depend on the type of project
  2. 2. Project assessment

    Before capital expenditure is fixed, the project is reviewed against Kazakhstan law and site conditions. The result is a written list of risks and a recommended sequence, while the budget can still be adjusted.

    • Applicable permits and the authority that issues each of them
    • Grid connection: voltage class, distance, and whether a technical specification can be obtained
    • Climate, seismic conditions and local-content implications for the chosen technology
  3. 3. Operating model

    Import of a finished line, assembly of a knocked-down line, or local manufacturing are treated as different projects. Land, partners and utilities are agreed at this stage so that design does not have to be redone later.

    • Choice of import, CKD assembly or manufacturing, including any joint-venture structure
    • Land plot and connection to power, water and transport, in principle
    • Allocation of responsibilities among the investor, Orken Partners and future contractors
  4. 4. Adaptation of the design

    The foreign engineering design is adapted to the standards of the Republic of Kazakhstan and submitted for state expert review. Orken Partners represents the owner's interests; EPCM Construction compiles the documentation under a Category I design licence.

    • Adaptation of supplier documentation to local design codes and climatic data
    • Set of sections required for expert review and for subsequent construction permits
    • Comments of the expert body and revision of the documentation until a positive conclusion is obtained
  5. 5. Construction and start-up

    Equipment is purchased to the agreed specification. Construction, installation and start-up are performed by EPCM Construction under a separate general contract. Orken Partners remains the owner's representative at this stage.

    • Specifications, tender and supply contracts without a mandatory single-OEM lock-in
    • General contract: civil works, installation, commissioning and handover
    • Acceptance of stages and notification of headquarters
  6. 6. Operation and reporting

    After handover the facility is transferred to the operating organisation. Headquarters continues to receive progress or operational reporting. Data is stored locally on the company's servers. Housing and premises are arranged through partners if staff relocate.

    • Handover documentation and operating arrangements
    • Visual monitoring system: access for named headquarters users; photographs and site data stored locally on the company's servers
    • Residence permits for employees of the client company, housing, office or warehouse where the project requires a local team

Contents of the mandate

Company and permits

Non-resident founder, legal entity (LLP or AIFC, as agreed), residence permits for employees of the client company, bank, tax and currency. Documentation is prepared by Orken Partners. Permits are issued by the competent authorities.

Localisation of production

Local content, joint venture, import, assembly or manufacturing. Land and networks are addressed at this stage, prior to the general contract.

Design for Kazakhstan

The foreign engineering design is adapted to the standards of the Republic of Kazakhstan, climate and seismic conditions. Prepared by EPCM Construction under a Category I design licence.

Equipment procurement

Specifications, tender, contracts and logistics, selected for the site.

Construction

General contract, installation, commissioning and handover: EPCM Construction under a separate agreement.

Site audit and supervision

Audit of design documentation, audit of construction and installation works, technical supervision. Separate from construction of the same facility.

Progress reporting

Visual monitoring system for headquarters: regular records of the site, access by role. Data is stored locally on the company's servers.

Personnel and premises

Residence permits and housing for employees of the client company; office, warehouse or plot through partners in the relevant cities.

Request a consultation

Enquiry

Please indicate the type of project, the country of origin of the investment and the current stage: decision, land, design or construction.